何耘,刘成.,韦鹤平.淤积条件下污水排放口工程上升管喷口高度的确定[J].水利学报,2000,31(5): |
淤积条件下污水排放口工程上升管喷口高度的确定 |
Determination of the height of riser port for sewage outfall in condition of sedimentation |
|
DOI: |
中文关键词: 排放口 上升管 射流 泥沙 |
英文关键词: outfall riser jet sedimentation. |
基金项目: |
|
摘要点击次数: 1622 |
全文下载次数: 81 |
中文摘要: |
结合上海市污水治理二期工程实例,利用泥沙运动相似理论,通过水力模型试验,从环境泥沙淤埋在上升管喷口上的最不利条件出发,分析喷口射流对泥沙的冲淤规律,提出喷口射流冲淤临界流速的概念;对试验数据进行相关分析,得出喷口射流冲淤的经验关系式,提出浅水域淤积条件下污水排放口工程上升管喷口高度确定方法. |
英文摘要: |
The behavior of port jet scouring under the most unfavorable sedimentation condition is experimentally investigated in hydraulic model test. The conception of critical sediment scouring velocity is defined and an empirical expression of the relationship among sedimentation depth, critical scouring velocity and jet diameter is obtained. On this basis, the method for determination of the height of riser port is proposed. |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |