李青云,张建红,包承纲.风化花岗岩开挖弃料配制三峡二期围堰防渗墙材料[J].水利学报,2004,35(11):0114-0118 |
风化花岗岩开挖弃料配制三峡二期围堰防渗墙材料 |
Plastic concrete for cutoff wall using weathered granite sand in stage II cofferdam of Three Gorges Project |
投稿时间:2003-10-26 |
DOI: |
中文关键词: 三峡工程 防渗墙 风化花岗岩 塑性混凝土 人工神经网络 配合比优化 |
英文关键词: cutoff wall weathered granite sand plastic concrete uniform design neural network optimized mixing proportion |
基金项目: |
|
摘要点击次数: 2164 |
全文下载次数: 143 |
中文摘要: |
本文介绍了三峡二期围堰防渗墙柔性材料的研制过程。采用三峡坝区开挖弃料-花岗岩风化砂代替塑性混凝土中的砂石骨料,用当地黏土代替膨润土,配制防渗墙柔性材料,通过均匀设计理论和人工神经网络技术相结合的方法对该材料的配合比进行了优选,满足了三峡二期围堰防渗墙的设计要求,该材料已运用于三峡工程二期围堰,效果良好。 |
英文摘要: |
The weathered granite sand is adopted as the aggregates of plastic concrete for cutoff wall in cofferdam of the Three Gorges Project. The local clay is added into the concrete to make it flexible. The uniform design theory and artificial neural network are applied to optimize the mixing proportion to meet the design requirements. The proposed concrete was successfully used in the Project. |