Page 107 - 2021年第52卷第10期
P. 107
breach flood[J]. Science China Technological Sciences,2020,63(7):1164-1176 .
[ 17] 陈祖煜,陈生水,王琳,等 . 金沙江上游“11 .03”白格堰塞湖溃决洪水反演分析[J]. 中国科学(技术科
学),2020,50(6):763-774 .
[ 18] 周兴波,杜效鹄,姚虞 . 金沙江白格堰塞湖溃坝洪水分析[J]. 水力发电,2019,45:12-16 .
[ 19] 张 晨 笛 ,林 永 鹏 ,徐 梦 珍 ,等 . 怒 江 干 流 堰 塞 坝 特 征 及 稳 定 河 床 机 制[J]. 水 利 学 报 ,2019,50(10):
1165-1176 .
[ 20] 程海云 .“11·3”金沙江白格堰塞湖水文应急监测预报[J]. 人民长江,2019(3):23-27 .
[ 21] 王敏,卢金友,姚仕明,等 . 金沙江白格堰塞湖溃决洪水预报误差与改进[J]. 人民长江,2019(3):34-39 .
[ 22] 陈敏 . 金沙江白格堰塞湖处置中水库应急调度经验与启示[J]. 人民长江,2019,50(3):10-14 .
[ 23] 郭新蕾,周兴波,夏庆福,等 . 梯级水库群控制梯级极端工况泄洪安全分析[J]. 水利学报,2017,48(10):
1157-1166 .
[ 24] 陈祖煜,胡贵良,蔡文靖,等 . 金沙江白格堰塞湖应急处置与减灾分析报告[R]. 北京:中国水利水电科学
研究院,2019 .
[ 25] 周兴波,陈祖煜,李守义,等 . 不同推移质输沙模型在溃坝洪水模拟中的对比分析[J]. 应用基础与工程科
学学报,2015(6):1097-1108 .
Lessons and experiences from emergency management of
Baige Barrier Lake on the Jinsha River,China
ZHOU Xingbo 1,2 ,ZHOU Jianping 2,3 ,DU Xiaohu 1,2 ,CHEN Zuyu 4
(1. China Renewable Energy Engineering Institute,Beijing 100120,China;
2. Research and Development Center of National Energy and Hydropower Engineering Technology,NEA,Beijing 100120,China;
3. POWERCHINA Limited,Beijing 100048,China;
4. China Institute of Water Resources and Hydropower Research,Beijing 100038,China)
Abstract: Based on the experience of emergency treatment of Baige Barrier Lake in the upper reaches of
the Jinsha River in 2018, the joint emergency rescue work mechanism such as inter-ministerial joint con⁃
sultation,central-local goverments coordination and linkage,emergency response social mobilization and di⁃
saster situation were summarized,and the possible disasters in the the Jinsha River if there is no cascade
hydropower stations joint operation and regulation was deeply analyzed. The results show that without flood
2
regulation of the Liyuan Hydropower Station,the inundation area would be increased about 160 km ,caus⁃
ing greater losses along the river. It is recognized that timely acquisition of barrier lake information is the
prerequisite for emergency disposal, rapid risk assessment is the technolical support, accurate analysis of
landslide dam break flood is the key, the coordination and linkage working mechanism is the guarantee,
the dynamic rescue project management is the scientific method, and the perfect high-dam reservoirs is
the fundamental way to deal with flood disasters. It is further proposed that (a) to strengthen the rapid ac⁃
quisition and processing technology of multi-source information of barrier lake under the condition of lack
information,(b) to strengthen the technical capability of rapid risk analysis and judgment under the condi⁃
tion of little information,(c) to strenghen the research and development of special equipment for emergen⁃
cy disposal of barrier lake,(d) to improve the overall management of emergency rescue projects and the
perfect coordinated linkage system,(e) to strenghen the development of high dams and risk management
and emergency dispatch system. It should provide references for the improvement of barrier lake risk dispos⁃
al technology and the comprehensive disaster prevention and mitigation of the river basin.
Keywords:barrier lake;landslide;landslide dam break flood;emergency response;risk treatmen