Page 71 - 2021年第52卷第10期
P. 71
[ 14] WANG X,HU T,ZENG X,et al . A bilevel modeling framework to analyze the institutional gap between research
and operation practices-Case on the Three Gorges Reservoir pre-impoundment problem[J]. Journal of Hydrolo⁃
gy,2020,585:124742 .
[ 15] WAN W,ZHAO J,LUND J R,et al . Optimal hedging rule for reservoir refill[J]. Journal of Water Resources
Planning and Management,2016,142(11):04016051 .
[ 16] ZHAO T,ZHAO J,LIU P,et al . Evaluating the marginal utility principle for long-term hydropower scheduling
[J]. Energy Conversion and Management,2015,106:213-223 .
[ 17] FAVRE A,ADLOUNI S E,PERREAULT L,et al . Multivariate hydrological frequency analysis using copulas
[J]. Water Resources Research,2004,40:W01101 .
[ 18] 刘章君,郭生练,李天元,等 . 贝叶斯概率洪水预报模型及其比较应用研究[J]. 水利学报,2014,45(9):
1019-1028 .
[ 19] 马川惠,黄强,郭爱军 . 泾河流域水沙联合分布特征分析及其不确定性评估[J]. 水利学报,2019,50(2):
273-282 .
[ 20] 曹瑞,申建建,程春田,等 . 梯级水库群汛前消落控制多目标优化方法[J]. 中国电机工程学报,2019,39
(12):3465-3474 .
[ 21] XU B,ZHU F,ZHONG P,et al . Identifying long-term effects of using hydropower to complement wind power un⁃
certainty through stochastic programming[J]. Applied Energy,2019,253:113535 .
[ 22] 程春田,申建建,武新宇,等 . 大规模复杂水电优化调度系统的实用化求解策略及方法[J]. 水利学报,
2012,43(7):785-795 .
[ 23] 周佳,马光文,张志刚 . 基于改进 POA 算法的雅砻江梯级水电站群中长期优化调度研究[J]. 水力发电学
报,2010,29(3):18-22 .
[ 23] 陈 森 林 ,梁 斌 ,李 丹 ,等 . 水 库 中 长 期 发 电 优 化 调 度 解 析 方 法 及 应 用[J]. 水 利 学 报 ,2018,49(2):
168-177 .
Long-term optimal operation of reservoir considering the water spillage risk during
the impoundment period
1
1
2
1
CAO Rui ,CHENG Chuntian ,SHEN Jianjian ,JIANG Yan ,ZHANG Congtong 2
(1. Dalian University of Technology,Dalian 116024,China;
2. Yunnan Electric Power Dispatching and Control Center,Kunming 650000,China)
Abstract: The large volatility of short-term inflow makes the long-term operation of the reservoir face a
greater risk of water spillage, which is an important factor that affects the rationality of the long-term opera⁃
tion of the reservoir. Considering the impact of daily inflow fluctuations, a quantitative evaluation method
for the water spillage risk during the impoundment period is proposed, and a long-term optimal operation
model for the reservoir considering the water spillage risk is established. Incorporating with the minimum
risk rules, we take the non-storage spillage as the risk indicator and use historical daily inflow data to cal⁃
culate the possible water spillage risk for each month of the impoundment period. The Copula model is
used to construct the joint distribution and conditional probability distribution of the monthly average inflow
and the water spillage risk, so as to obtain the risk confidence interval for the specific inflow condition. Fi⁃
nally, the water spillage risk is integrated into the long-term optimization model in the form of energy loss
to obtain a more practical operation plan. The controlling reservoir Xiaowan in the Lancang River Basin is
used as an example to simulate the operation. The results show that the method proposed in this paper can
effectively reduce the water spillage risk in long-term operation of the reservoir and improve the operability
of the optimization results. Compared with the conventional method, the proposed method can reduce the av⁃
3
6
6
erage annual spillage by about 476×10 m and increase the power generation by about 115×10 kW·h.
Keywords:controlling reservoir;optimal operation;water spillage risk;Copula model;conditional distribution
(责任编辑:杨 虹)
— 1203 —