Page 125 - 2025年第56卷第5期
P. 125
.
[ 20] 秦长海 . 水资源定价理论与方法研究[D] 北京:中国水利水电科学研究院,2013.
[ 21] 梁伟 . 基于 CGE 模型的环境税“双重红利”研究[D] 天津:天津大学,2013.
.
.
[ 22] 田冉 . 用水达峰规律解析及我国用水达峰预测[D] 郑州:华北水利水电大学,2024.
[ 23] 时间,沈大军 . 高耗水工业用水量控制和水价调整政策效果研究:基于水资源动态 CGE 的分析[J] 自然资
.
源学报,2016,31(9):1587-1598.
.
[ 24] 彭卓越 . 调水工程的水资源多维价值评估研究[D] 上海:东华大学,2018.
[ 25] 甘泓,汪林,倪红珍,等 . 水经济价值计算方法评价研究[J] 水利学报,2008,39(11):1160-1166.
.
[ 26] 王思哲,黄喜良,肖理奇 . 基于分摊系数法的河南省城镇供水效益分析[J] 水资源开发与管理,2021(7):
.
14-18.
[ 27] 林希晨 . 长江经济带水-碳-经济调控模拟模型研究与应用[D] 北京:清华大学,2023.
.
[ 28] 龙笛,杨文婷,孙章丽,等 . 海河平原地下水储量变化的重力卫星反演和流域水量平衡[J] 水利学报,
.
2023,54(3):255-267.
[ 29] 郑阳,于福亮,桑学锋,等 . 长江流域水系统生态服务价值评价方法[J] 中国水利水电科学研究院学报(中
.
英文),2023,21(3):222-235.
[ 30] WANG Y, ZHU K, XIONG X, et al. Assessment of the ecological compensation standards for cross-basin water
diversion projects from the perspective of main headwater and receiver areas[J] International Journal of Environmen⁃
.
tal Research and Public Health,2023,20(1):717.
[ 31] 赵勇,王浩,邓铭江,等 . 黄河几字弯水网:南水北调西线配套东延工程构想[J] 水利学报,2023,54(9):
.
1015-1024.
Comprehensive benefit evaluation and prediction for Phase I of the East and
Middle Routes of South-to-North Water Diversion Project
1,2 1 1 1 1 1
YANG Mingming ,ZHAO Yong ,QIN Changhai ,ZHU Yongnan ,HE Guohua ,WANG Lizhen
(1. State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin,China Institute of Water Resources and Hydropower
Research,Beijing 100038,China;2. College of Hydrology and Water Resources,Hohai University,Nanjing 210098,China)
Abstract:The inter-basin water diversion project has a long construction period,large investment scale,and wide
impact range,and its comprehensive benefits are often difficult to define clearly. From the perspective of the whole
life cycle,this paper reviews the path of project benefits,constructs an evaluation method based on factor-driven
analysis,and combines it with a computable general equilibrium model to evaluate the comprehensive benefits of
Phase I of the East and Middle Routes of the South-to-North Water Diversion Project from 2003 to 2023,and to simu⁃
late and predict the water supply benefits under different water supply growth rate scenarios from 2024 to 2035. The
results show that by the end of 2023,the Phase I Project of the East and Middle Routes had accumulated a total posi⁃
tive benefit of 2.349 trillion RMB,mainly comprising investment,water supply,and ecological benefits;the nega⁃
tive impact amounted to 252.5 billion RMB,primarily attributed to lost industrial development opportunities and
reduced water ecosystem capacity. The cumulative net benefit of the project is 2096.5 billion RMB,of which social
and economic benefits account for 75% and ecological benefits account 25%. Since 2020,with the continuous
advancement of industrial adjustment policies and governance projects,the ratio of negative to positive benefits of the
project has dropped from 0.15 in 2006 to 0.05. The simulation results of the SNWDP-DCGE model show that from
2024 to 2035,the project will generate a total of 3.778 trillion RMB in water supply benefits under the high-speed
growth water supply scenario,which are 1.10 and 1.21 times of those under the low-speed and medium-speed growth
water supply scenarios,respectively. A long series of evaluations of the comprehensive benefits of water diversion
projects from a full life cycle perspective will help to fully and objectively understand their multiple impacts.
Keywords:South-to-North Water Diversion Project;social and economic benefits;ecological benefits;CGE Model
(责任编辑:韩 昆)
— 671 —